KEY HIGHLIGHTS
- Effective 18 September, Kepmen ESDM 365/2026 bars IUP/IUPK holders from using subsidiaries or affiliates for mining services without the Minister’s approval, and requires them to prioritise local firms.
- The sharp edge is the beneficial-owner test: Diktum KETIGA(b) reaches sister companies that share an ultimate beneficial owner, capturing the conglomerate captive model — Adaro’s SIS, Bayan’s IPR, and Prajogo’s Petrosea via CUAN — and a spin-off does not break the link.
- Exemptions are two-layered and discretionary: relief is only for a permit-holder running a government assignment (PSN, smelter/refining, or domestic supply), applied for case by case — owning a smelter alone is not a pass.
- The real channel is margin capture, not just cost: mining-contractor work is ~55-60% of cash cost at a ~10-15% margin, so losing the captive leaks that margin out of the group — the most vertically integrated names are the most exposed, while an outsourced miner like ITMG is neutral.
- Base case is a gradual, renewal-point drag rather than a cliff-edge, but the decree has no explicit transition clause and reaches existing KK/PKP2B/IUPK-KOP contracts — a re-approval risk pending a Dirjen circular.
- Most exposed: IPR (Bayan), Petrosea (CUAN); partly hedged: SIS (Maruwai/ADMR smelter PSN). Beneficiaries: independent, arm’s-length contractors — BUMA (DOID), Darma Henwa (DEWA), MYOH, ABMM, IBP/KKGI. We are structurally positive on the independent contractors and cautious on the pure captives miners near renewal.
Regards, Aldiracita Research